The problem

Custom manufacturing is a coordination problem before it is a production problem.

A company that builds to order rarely makes the same thing twice. Each project is engineered in the technical office, sourced by procurement and built on the production floor, and each function works from its own account of it: drawings, a bill of materials, a production schedule. Those accounts are reconciled by hand, and every revision has to reach all three before material is ordered or cut. When one does not, the error shows up late: a part cut to an old drawing, the wrong item shipped, or one left out of the delivery.

Technical office

Turns what the client approved into drawings and part lists. Each revision changes parts that may already be on order or in production.

Procurement

Buys material and hardware against a design that is still changing. A revision that arrives late becomes surplus stock or a missing part.

Production floor

Builds from the documents it was last issued. Whether they are still current is a question someone has to ask.

Concept, example data

Organised by what the workshop ships, not by the data.

A concept of a Galtri screen. On the left the outline of a project: Hillside residence, Villa B, the living room on floor 1, a console. In the middle the console, its revision, material and five facts, each marked measured, computed, read or confirmed, with who and when; the client's approval of revision C is marked as needing a person. On the right the client's email that approval was read from.
  1. One shared definitionThe project as the workshop ships it: building, area, piece. People find things the way they talk about them, and agents structure the data behind it.
  2. Authority and accessEvery value shows how it is known and who stands behind it. Access is enforced: each person and company sees and changes only what they are entitled to.
  3. Agents in the backgroundAgents collect and structure the information, the work of a data team a workshop cannot afford. Here one read the client's approval in an email, and it waits for a person to confirm it.
  4. Workflows on topThe CAD model, parts, orders, production and shipping run on the same record.
What it is built for

Three results, and two that follow from the record itself.

Fewer errors.

Less time spent on coordination.

The capacity to take on more complex, and therefore more valuable, projects.

A dispute over what was agreed is settled by what was signed.

The workshop no longer depends on a few key people holding the whole picture.

These are the aims Galtri is designed for, not measured results. It is in closed pilot.

What is different

Agents do the work of a data team a workshop cannot afford.

Agents do the data work

A large company has a data team to collect and structure its information. A workshop cannot afford one. In Galtri, AI agents do that work in the background, as each drawing, revision and supplier's reply comes in. They do not decide.

Shared between companies

The record is shared context across the companies on a project: the workshop, the design studio, the project manager and the suppliers, each under its own access rights.

People hold the authority

What agents do well is automated. People are brought in only for the decisions that need them, and each decision is signed by the person with the authority to take it.